Renovating a hair salon: priorities and systems

In a salon renovation, the order of work matters more than the budget: what is under the floor and inside the walls must be decided first, because going back to it later costs many times more.

The invisible first, then the visible

Interventions are divided into two categories: those that become inaccessible once walls are closed and floors are laid, and those that can be redone at any time. The first category includes drains, supply lines, electrical lines, ventilation, and preparations; the second includes furniture, finishes, and decorative lighting.

It is an obvious fact that is constantly betrayed, because the budget is spent on the visible part, which is what is shown and what excites. The result is beautiful salons where adding a station requires breaking the floor.

The practical criterion is to provide for more than is needed today for everything that is hidden: an extra socket per station, a provision for an additional wash unit, electrical capacity for future appliances. The marginal cost during the construction phase is minimal, the subsequent one is not.

Important note: Interventions on systems require certificates of conformity which are needed for opening procedures.

Work priorities

The table distinguishes what cannot be postponed from what can wait for a second phase.

InterventionPriorityWhy
Plumbing and hydraulic preparations Cannot be postponed Determine where the wash units can be placed
Electrical capacity and distribution Cannot be postponed Binds future workstations and equipment
Ventilation and air exchange Cannot be postponed Premises requirements and daily comfort
Furnishings, finishes, decoration Postponable Replaceable at any time
Operating method

How to order the work

01

Decide the invisible

Drains, electrical, and ventilation before closing the walls.

02

Overestimates predispositions

One extra station and one extra water point compared to the original plan.

03

Collect compliance documents

Ask the installers for them at the same time as the work.

04

Keep a reserve

Structural unforeseen events in a renovated space are frequent.

How to manage the construction site

  • Overestimates hidden predispositions: the marginal cost is minimal.
  • Collect declarations of conformity as you go, not at the end.
  • Budget a reserve for structural contingencies.

A contingency reserve is not pessimism: in premises not originally built to house a business with extensive plumbing, the probability of discovering something during renovations is high. A budget without a margin forces you to cut precisely on the hidden parts, which is the wrong place to cut.

Coordination with installers determines the actual opening times. Declarations of conformity are needed for paperwork, and requesting them after work is finished often means waiting weeks with the salon ready and the opening date stalled.

Practical application in Saloria

From guide to salon work

With Saloria, you can start for free with an appointment calendar, client records, and a product showcase. The guided consultation, face and hair analysis, reports, matching and indicative AI previews are included in every plan; Free includes 10 consultations a month. The readings are descriptive and do not constitute medical diagnoses or beauty measurements. Face and hair analysis. Compare updated features, quotas, and prices.

Create free account
Useful sources and verifications.

To be consulted before deciding

Compliance requirements for the premises and sector risk profiles guide work priorities; specific regulations must be requested from the municipality and the local health authority. The INAIL source uses the historical ATECO 2007 classification. For the current classification, consult ISTAT.

Frequently asked questions

What should you not save on?

On everything that becomes inaccessible: drains, electrical lines, ventilation. Going back to it later costs many times the initial savings.

How much should you oversize the preparations?

By providing at least one extra workstation and one water point compared to the current project: the marginal cost on-site is limited.

When to request declarations of conformity?

Concurrently with the work on each system: they are needed for opening procedures, and requesting them at the end extends the timeline.

Saloria Editorial Team · Offer verified on October 24, 2026. The Saloria functions described were compared with the product offering on October 24, 2026. Operational indications do not guarantee economic or aesthetic results.

Contact Saloria to report a correction · Privacy and owner information